Alternative Energy Enterprise
โครงการผลิตไฟฟ้าเซลล์แสงอาทิตย์ลอยน้ำ (Floating Solar) ขนาด 19.90 MWp
โซล่าลอยน้ำ ขนาดกำลังผลิตติดตั้ง 117.325 kWp พลังงานไฟฟ้าได้โดยเฉลี่ยประมาณ 410 kWh ต่อวัน
Solar Rooftop ผลิตกระแสไฟฟ้าสามารถผลิตพลังงานไฟฟ้าได้โดยเฉลี่ยประมาณ 43 kWh ต่อวัน

Solar Rooftop Project at Gateway City Industrial Estate

MDX Public Company Limited, through MDX Green Energy Company Limited, installed solar panels on the rooftop of the estate for power generation for internal use. The capacity is 12.35 kWp. The implementation was completed in 2019, with a permit granted by Office of the Energy Regulatory Commission for power-related operation exempt from permit filing and approval for connection to the system of Provincial Electricity Authority. Regarding performance, the production capacity is approximately 43 kWh per day. The generation is mainly for internal use within the estate, resulting in significant savings of electricity cost.

19.90 MWp Floating Solar Project

With awareness of taking part in an effort toward carbon neutrality to tackle global warming, MDX Public Company Limited is set to implement the 19.90 MWp Floating Solar Project and distribute the power for internal use within Gateway City Industrial Estate. The installation will be at the estate reservoir, with capacity for up to 48.00 MWp.

Phase 1 with capacity of 19.90 MWp is expected to begin at the end of 2023, with target completion in 2025.

117.325 kWp floating solar

MDX Public Company Limited hired Ciel & Terre (France) as an expert in the design and installation of floating solar panels on the reservoir (with capacity of 7 million cubic meters on the area of around 450 Rai) for the pilot project and the studies of power production to be connected to distribution system of Provincial Electricity Authority to be used within Gateway City Industrial Estate. installation was implemented on the reservoir space of around 1 Rai.

Power production is approximately 410 kWh per day. The power will be used for the water supply system of Gateway City Industrial Estate. The past performance showed the cost saving for electricity cost of around 80,000 Baht per month or carbon dioxide reduction of around 96.15 ton CO2 per year, equivalent to forestation of around 12,018 trees or on the space of 30 Rai.